Logo
  • Home
  • My Page
  • Tester Community
  • Testing Question Bank
  • Blog navigation
  • Downloads
  • Testing Quiz
  • Forum
  • Groups
  • Testing Related Video
  • Photos
  • Ask
  • Answer
  • Search Answers
  • Software Testing
  • Software Testing Tools
  • Test Management
  • Quality Engineering
lost pwd lost username create account
Home Testing Question Bank Ask
Question Corner - Ask QuestionsAnswer QuestionsSearch for Knowledge
Category: Test Tools
al_b

Undecided Question

how can I Migrate from HP Quality Center Version 9.2 to Version 10?
Answer Question Report as abusive/illegal
Tags: HP Quality Center Version 9.2,HP Quality Center Version 10,Migrate path for quality center
  • 1 Interesting!
  • Hits: 81
  • Expires in: Expired
Answer Question
Current Answers to this Question (1) :

Answers:

  • ayon

    PreDeployment
    1. In Quality Centre V9.2 Site Admin
    a. Create a new DB Server that points to your Version 10 Database Server - i.e. the connection string points to the server where your Version 10 database resides
    b. Create a new Domain that will be used to transisition your projects between the two versions
    2. In Quality Centre V10 Site Admin a. Create a new DB Server ( on your Version 10 box ) that has EXACTLY the same name as the one you created in Version 9.2 ( step 1a )
    b. Create a new Domain that will be used to transisition your projects between the two versions
    3. On your Version 10 Apps Server - in Windows Explorer map the repository directory from Version 9.2. This is necessary to be able to find the dbid.xml file for the projects in the transition Domain

    Steps:
    1. In Quality Centre V9.2 Site Admin
    a. Copy a Project into the transisition Domain. Select the DB Server that points to the Version 10 DB - as created above
    b. When the copy is complete remove the Project from the Domain - do not delete

    2. In Quality Centre V10 Site Admin
    a. Create the Project by clicking on the Restore Project option and then select the relevant dbid.xml file from the VersionĀ  9.2 repository.
    b. Verify, Repair, and Upgrade the Project
    c. Copy the Project from the transition Domain to a 'proper' Version 10 Domain. This is necessary to move the repository off the Version 9.2 server and onto the Verison 10 server
    d. Delete the transition Project

    If possible it is better to perform all tasks directly on the App Servers of the two versions.
    Once all copies has been completed then there are clean up tasks. Folders in the qc repository on both Versions as well as the Upgrade logs on the Version 10 serve.


    • 10/26/2009
    • 16 Rate this answer as good
    • 12 Rate this answer as bad
    • Report as abusive/illegal


Google

SoftwareQAtestings.com is an Open community where you can share Software testing interview questions, comment / answer any qa tester question. Each software QA question is like discussion thread that helps you to learn and understand each question and answer in detail instead of just reading them.

Open Questions

 1  Can perl be used for mobile devices like j2me?
 2  Software License Testing
 3  Manual testing material for certification
 4  What in contained in the GUI map?
 5  How do you analyze results and report the defects?
 6  What different actions are performed by find and show button?
 7  Test Results
 8  Explain the Configuration of your systems?
 9  Can anyone Help me in finding Sr Test Engineers(Manual)
 10  How can i become a good tester

Random Questions

 1  Is it possible to conduct loadtesting with winrunner?I f possible how to test?
 2  silk test has print statement to print the values but how to read the values ... it uses 4 test language. read command is there in silktesT? please clarify me?
 3  How you integrated your automated scripts from TestDirector?
 4  How can we record dynamically moving objects with help of winnrunner testing toolLatest
 5  How do you identify which files are loaded in the GUI map?
 6  What is the DOM browser extension?
 7  How do you pass parameters in a silk test ?For example, How do you pass parameters from test plan to test case?
 8  How to create compile module. give me some examplehow to call tests? example
 9  How cache memory is released in winrunner?
 10  What do you like about QA?
logo footer
  • Privacy Policy
  • Contact Us
  • Antivirus Software Reviews