1) ______ indicates the degree to which a measure actually measures what it was intended to measure.
A. Validity
B. Calibration
C. Simplicity
D. Reliability
{mosgoogle left}
2) A major obstacle for deployment of wireless networks is ____________
A. The existence of multiple standards.
B. Limited Coverage
3) _______ is process attributes define the objective to be achieved using new technology.
A. Standard
B. Procedure
C. Quality control
4) ________ an approach Management selects to align assessed risks with the
organizations risk appetite, in the context of the strategy and objectives.
A. Risk Response
B. Risk Analysis
C. Control Activities
D. Monitoring
5) Event Identification component comes under which Internal control model ?
- COSO
Risk Management ModelEnterprise - COSO Internal Control Model
- CobiT Model
6) __________is the risk to an organization in the absence of any actions management might take to alter either the risks likelihood or impact.
A. Inherent risk
B. Residual risk
C.
D. Business risk
7) _______ are the the means by which management manages things such as organizational policies, the organizational structure in place to
perform work, the method of hiring, training, supervising.
- Transaction Processing control
- Control activities
- Environmental control
- Security control
{mosgoogle left}
8) Testers need to answer which of below questions when testing utilizes new
technology?
A. How to optimize effectively new technology?
B. How will the testing process address those risks?
- How many professional resources required to meet goals?
9) ___________is designed to determine whether the software is fit for use.
- Usability testing
- Acceptance testing
- System testing
- Security testing
10) Which of following is component of fit for use ?
A. Data
B. People
C. Rules
D. Structure
E. All of above
11)Which is Software testers role in acceptance testing ?
A. no involvement at all.
B. an active participant
C. an advisor.
- All of above
12) _______ relate to the business rules that the system must execute.
- Functionality Requirements
- Interface Quality Requirements
- Performance Requirements
- Overall Software Quality Requirements
13) FP is method primarily used to measure _________
- Defect density
- Complexity
- Size
- Mean time to Failure(MTTF)
14) _______is a statistical technique to assess, monitor and maintain the stability of a process.
- Run Chart
- Control Chart
- Histogram
- Check sheet
15)_______ is an Auxiliary code which sets up an appropriate environment
and calls the module.
- Stub
- Driver
- Sybmolizer
- Axioms
16) Ethical behavior and management integrity are a product of the corporate culture.
A.True
B.False
17) Managerial desires and intents concerning either process or product is
A. Procedure
B.Policy
C.Standard
18) Which of following is not a channel of communication ?
- Information
- Vocal
- Graphics
- Secure
- Body
19) The primary purpose of interviewing is ___________.
- Fact-Finding
- Oral Communication
- Listening skill
20) The first step during complaint-resolution process is
- Get the facts
- Get on yours customers wavelength
- Establish and Initiate action program
- Follow up with your customer
21) The objective of performing risk analysis as part of test planning is _________
- To help allocate limited test resources
- To improve process
22) Majority of system errors occurs in the design phase.
- True
- False
23) Acceptance testing is
- White-box testing
- Black-box testing
- Thread testing
- Incremental testing
24) An objective measure is a measure that can be obtained by ______
A. Counting
B. Interviewing
C. formula
D. Calculating
25) Subjective measures are much more important than objective measures.
- True
- False
26) In Contracting process the factor Foreign attachments addresses which of below concern ?
A. If the application system is interconnected with applications and/or other software
from different contractors
B.other few options ..
27) Test Competency is based on which of following criteria?
- CBOK knowledge
- Skill sets and Experience
- Skill sets and Performance
- Tools and Techniques
1) ______ indicates the degree to which a measure actually measures what it was intended to measure.
A. Validity
B. Calibration
C. Simplicity
D. Reliability
2) A major obstacle for deployment of wireless networks is ____________
A. The existence of multiple standards.
B. Limited Coverage
A. Risk Response 5) Event Identification component comes under which Internal control model ? 6) __________is the risk to an organization in the absence of any actions management might take to alter either the risks likelihood or impact. A. How to optimize effectively new technology? 9) ___________is designed to determine whether the software is fit for use. 10) Which of following is component of fit for use ? 11)Which is Software testers role in acceptance testing ? 12) _______ relate to the business rules that the system must execute. 13) FP is method primarily used to measure _________ 14) _______is a statistical technique to assess, monitor and maintain the stability of a process. 15)_______ is an Auxiliary code which sets up an appropriate environment 17) Managerial desires and intents concerning either process or product is 18) Which of following is not a channel of communication ? 22) Majority of system errors occurs in the design phase. 26) In Contracting process the factor Foreign attachments addresses which of below concern ? 27) Test Competency is based on which of following criteria?
3) _______ is process attributes define the objective to be achieved using new technology.
A. Standard
B. Procedure
C. Quality control
4) ________ an approach Management selects to align assessed risks with the
organizations risk appetite, in the context of the strategy and objectives.
B. Risk Analysis
C. Control Activities
D. Monitoring
A. COSO Enterprise Risk Management Model
B. COSO Internal Control Model
C. CobiT Model
A. Inherent risk
B. Residual risk
C. Enterprise risk
D. Business risk
7) _______ are the the means by which management manages things such as organizational policies, the organizational structure in place to
perform work, the method of hiring, training, supervising.
A. Transaction Processing control
B. Control activities
C. Environmental control
D. Security control
8) Testers need to answer which of below questions when testing utilizes new
technology?
B. How will the testing process address those risks?
D. How many professional resources required to meet goals?
A. Usability testing
B. Acceptance testing
C. System testing
D. Security testing
A. Data
B. People
C. Rules
D. Structure
E. All of above
A. no involvement at all.
B. an active participant
C. an advisor.
E. All of above
A. Functionality Requirements
B. Interface Quality Requirements
C. Performance Requirements
D. Overall Software Quality Requirements
A. Defect density
B. Complexity
C. Size
D. Mean time to Failure(MTTF)
A. Run Chart
B. Control Chart
C. Histogram
D. Check sheet
and calls the module.
A. Stub
B. Driver
C. Sybmolizer
D. Axioms
16) Ethical behavior and management integrity are a product of the corporate culture.
A.True
B.False
A. Procedure
B.Policy
C.Standard
A. Information
B. Vocal
C. Graphics
D. Secure
E. Body
19) The primary purpose of interviewing is ___________.
A. Fact-Finding
B. Oral Communication
C. Listening skill
20) The first step during complaint-resolution process is
A. Get the facts
B. Get on yours customers wavelength
C. Establish and Initiate action program
D. Follow up with your customer
21) The objective of performing risk analysis as part of test planning is _________
A. To help allocate limited test resources
B. To improve process
A. True
B. False
23) Acceptance testing is
A. White-box testing
B. Black-box testing
C. Thread testing
D. Incremental testing
24) An objective measure is a measure that can be obtained by ______
A. Counting
B. Interviewing
C. formula
D. Calculating
25) Subjective measures are much more important than objective measures.
A. True
B. False
A. If the application system is interconnected with applications and/or other software
from different contractors
B.other few options
..
A. CBOK knowledge
B. Skill sets and Experience
C. Skill sets and Performance
D. Tools and Techniques